RJB partners with Tesla to install EV charging stations across the Northeast, setting the newest V3 stations on roughly eight-week projects. Each site adds 8 to 20 chargers, built from the utility transformer all the way to the charge post.
Each build runs the full scope, from the utility transformer to the charge post. Crews start by excavating utility trenches to run wire and pour the footings for the power cabinets and posts. RJB sets the forms and lays detailed templates that guide the electricians through the wire runs, so every connection lands in the right place. Large PVC conduit goes in, then the concrete is poured and curbs are formed. After backfilling, crews run roughly four miles of wire and set and connect the power cabinets and charging posts. Paving, striping, signage, and finish details bring each site to the point of electrification.